CURRICULUM
VITAE
PERSONAL DATA:
NAME : MUHAMMAD NASIM
FATHER'S
NAME : A.M. Fakhruzzaman Mahnavi
DATE
OF BIRTH : December 15, 1946
NATIONALITY : Pakistani
P.E.C. Reg. No. : Mech. -1007
H
EALTH : Excellent
PHYSIQUE : 175 cm tall, 82 kg weight, swarthy, glasses
ADDRESS : D-1, Doulat
Square, Gulshan-e-Iqbal, Block13/B, Karachi, 75300.
TELEPHONE
No. : (92 21) 34992612, 34974075, 03008272567
E-MAIL ADDRESS : mnasim_99@yahoo.com
EDUCATIONAL QUALIFICATIONS:
Matriculation : Saidpur Muslim
High School, 1961, First
Div. 20th Position in East
Pak S.E Board.
H.S.C. : Chittagong College,
1963, First Div.
B.Sc. (Mech Eng) : EP Univ of Engg & Tech, Dacca, 1967, 1st Class
Scholarship : Burmah Eastern UK
Postgraduate Scholarship at UMIST
M.Sc. (Mech Eng) : University of Manchester,
1971.
PROFESSIONAL AFFILIATIONS:
American
Society of Mechanical Engineers
Am.
Soc. of Heating, Refrig. & A/c. Engineers
Institution
of Engineers, Pakistan
(Life Fellow)
Pakistan Engineering Council (Life)
Society
of American Military Engineers.
Pakistan
HVACR Society (Life Fellow)
COMPUTER SKILLS:
Frequent
use of commercial packages such as Word, Excel, Carrier E20 II, MC -2 package
of Mechanical, Piping, Electrical, Project Management, Life Cycle Analysis etc,
Autocad, Mathcad, FEA, Advanced Basic and Fortran Programming, Windows etc.
Developed an Urdu Word Processor.
CODES & STANDARDS:
Thoroughly
conversant with the scope and application of specific Standards and Codes of
practice by ANSI, ISO, ASME, ASHRAE, ASTM, NFPA, UL, AWWS, AWWA, BS, DIN, JIS,
GOST, API, SMACNA, AFNOR, US Fed. & Mil. Specs.
PROFESSIONAL EXPERIENCE: Total 40 years.
1. CONSULTANCY:
Total 21 years.
a) International Complex Projects Private Ltd, August, 2010 to date
Dolmen City, Marine Drive, HC-3 Block-4 Clifton,
Karachi.
Tel: 021-35296062-64,
General Manager Engineering.
b) MN & Associates, Karachi, December
2006 to July, 2010
D-1 Doulat Square,
Gulshan-e-Iqbal 13/B, Karachi,
Phones:
4992612, 03008272567; Fax: 4809144.
Chief
Executive – Consulting Engineering for HVAC, Mechanical and Plumbing works of
Commercial, Industrial and Residential Buildings.
c) A. SAADAT & COMPANY, KARACHI.
1994-1999 & Nov 2001 to Sep 2006
4th
Floor, Hamid Chambers, Zebunnisa
Street, Saddar, Karachi,
Phones:
5670439, 5670444; Fax: 5670448
GENERAL
MANAGER DESIGN / MANAGER ENGINEERING PROJECTS / SENIOR ENGINEER - Responsible
for design, documentation, supervision, maintenance and retrofitting of Central
Airconditioning systems of numerous hospitals, pharmaceutical and other
industrial factories, commercial and
institutional buildings, Industrial process chilling, heating, filtration,
ventilation, humidification, pumping and process control systems. Scope of work
includes concept development, design calculations, preparation of drawings and
tender documents, tender scrutiny, negotiating contracts, technical supervision
and contract management.
Clients:
National Bank of Pakistan, Pakistan Cables, Agha Khan Hospital Karachi, SIUT
Dewan Farooq Medical Complex, Shell Pak Ltd, Siemens, GlaxoSmithkline, Aventis
Pharma, Radio Pakistan, Lucky Textile Mills, Karachi Marriott Hotel, Lahore
Pearl Continental, Allied Engineering Services
etc.
O&M
consultancy of completed projects includes annual repairs and spare-parts
planning, trouble shooting and manpower assessment. Equipment handled include
air/water-cooled compression cycle and absorption Chillers upto 650 TR, Boilers
upto 500 hp, Gas Engines upto 1000 hp, Pumping sets upto 3000 gpm and 200 psi,
Cooling towers with up to 50 hp fans, RO plants upto7500 gpd, Piping up to 12
inch dia. Heat exchangers, valves and Automatic control systems.
Clients:
National Bank of Pakistan, Shell Pakistan Ltd,
b) INTERNATIONAL CONSULTANTS / FREELANCE,
KARACHI. 1990-93
SENIOR
ASSOCIATE / PROJECT DIRECTOR - Business development, planning, design and
feasibility study of Power Generation, Fertilizer plant and other Industrial
Projects.
Clients:
BRR/KEMIRA, State Life, Phillips, etc.
c) SVERDRUP - ABALKHAIL JV / BEEAH GROUP
CONSULTANTS,
RIYADH, SAUDI
ARABIA.
i)
PEACE SHIELD / LRR PROJECT: 1988-90
SENIOR
MECHANICAL ENGINEER - Assigned to Engineering During Construction Team for the
Peace Shield project (under the Ministry of Defense, and the US Air Force). In
charge of 3 Engineers with VSMF information retrieval & Autocad systems.
Responsibilities included the following functions related to numerous Under-ground Command Centers
and Long Range RADAR Sites:
1. Checking the design and performing quality
assurance review of Mechanical shop drawings, for underground and above ground
facilities, such as water and fuel storage and pumping systems, ventilation and
smoke control systems, ducting, blowers, automatic control systems etc.
2.
Vibration Isolation analysis,
acoustical engineering studies and supervision of specialized custom designed
equipment development, such as water chillers, air handling units, computer
room units etc. using state of the art technology.
ii) GOSI MAIN OFFICE /
MISCELLANEOUS: 1985-87
SENIOR
MECHANICAL ENGINEER - In charge of 3 Engineers and 3 Draftsmen. Major
assignments completed were:
1.
Computer aided redesign of GOSI
Main Office
Building airconditioning
system using dual conduit system as per ASHRAE standards, total installed
cooling capacity 880TR, Water supply & Fire protection systems, including
Sprinkler and Halon. Computer based Buildings Management system (Honeywell).
Contract administration (Korean contractor).
2.
Computer aided life cycle analysis and design of airconditioning and sprinkler
systems for the 20 storied SAPICO Building in Islamabad,
Pakistan.
3.
Review and approval of all Mechanical materials and shop drawings for the Saudi
Embassy in San'a, Yemen,
with deep well and sewage treatment plant.
2. CONTRACTING: Total 9 Years.
EL-SEIF
ENGINEERING AND CONTRACTING EST, RIYADH
SENIOR MECHANICAL ENGINEER –
Stationed at Riyadh
Head Office
From
June 1999 to October 2001.
In
charge of design, planning and construction of all Mechanical works, including
HVAC, Plumbing, Fire Sprinkler & FM 200 systems, Mechanical Utilities and
Compressed Air systems of numerous design and build projects.
i)
KING KHALID AIR BASE, KHAMIS MUSHAYT PROJECT:
Responsibilities
included design, preparation of shop drawings, preparation of purchase orders,
subcontract negotiations, solving site problems and preparation of
Commissioning Procedures and O&M manuals. Facilities included, Command and Control
Center, Missile Buildup and Checkout, Aircraft Washrack, Lantirn, Armament,
Computer Centre, Special Service Vehicle maintenance and ordnance storage
facilities.
ii)
Al- JAMMAZ RESIDENCE PROJECT, RIYADH
Responsibilities
included design, preparation of shop drawings, sub-contract administration and
solving site problems for HVAC, Plumbing and all Mechanical works.
AL-HUSEINI ADA
/ OBAID AND ALMULLA CONST. CO. S.A.
i) ENGINEERING SCHOOL PROJECT: 1983-85.
SENIOR
PROJECT ENGINEER - Assigned to S.A.
Army Engineer
Center and School Project
at King Khalid Military City (KKMC) under U.S. Army COE supervision. In charge
of 3 Engineers and 4 Inspectors. Functions included:
1. Administration of subcontracts for Utilities,
Bldg electrical and mechanical works and equipment and furnishings (total value
approximately U.S. Dollars Thirty million). US & Cypriot Contractors.
2. Costing and negotiation of contract
modifications with client and subcontractors. Scheduling of E/M works using
computerized CPM and coordination with civil works.
3. Quality
Control review of Subcontractor Shop-drawings and material submittals for
Airconditioning, Pumping, Pneumatic, Irrigation and Training equipment.
4.
Tracking of material procurement, solution of field problems, progress
reporting and preparation of O & M manuals.
ii) HOUSING PROJECT : 1980-83.
SENIOR ENGINEER 1 (TECHNICAL MANAGER) E/M Planning and
Quality Control - Assigned to KKMC Housing Area 1 & 3 Project under the
supervision of US COE. In charge of 4 Engineers, 4 Draftsmen and 4 Inspectors.
Accomplishments included the following:
1. Preparation
and revision of bills of quantities and selection of equipment & materials
for E/M works (total value nearly US$ 30 millions).
2. Preparation
of nearly 600 shop drawings for E/M works including nearly 200 km of utility
piping such as Water, Sewer, Chilled water, Under-drainage and Irrigation;
Plumbing and Central Airconditioning of 1750 houses and 2 mosques with district
cooling; electrical duct-banks, substations and internal electrical works,
development of Inventory Control System.
3. Preparation
of quality control procedures, forms, checklists etc., solution of field
problems and costing and negotiation of contract modification proposals, and
preparation of O & M manuals.
4. Coordination
of Labor subcontract for E/M works (worth US$ 9 millions), scrutiny and
approval of bills (Korean Subcontractor).
iii) AL-KAIM FERTILIZER PROJECT, IRAQ:
1979-80.
SHORT ASSIGNMENT WITH F.L. SMIDT OF DENMARK
MECHANICAL
ENGINEER - Provided engineering support during construction of fertilizer
complex, such as weld design, Kiln roller support calculations etc., and
quality control of fuel storage tanks and piping system welding to API standards.
3. TEACHING AND RESEARCH: Total 6 Years.
a) NED UNIVERSITY
OF ENGG. & TECH., KARACHI:
1979.
ASSISTANT
PROFESSOR - Taught Solid Mechanics and Vibration in degree courses. Served for
many years as External Examiner of NED university for Solid Mechanics and
Stress Analysis.
b)
UNIVERSITY OF MANCHESTER,
U.K.: 1970-75.
RE
SEARCH
STUDENT AND RESEARCH FELLOW - Research and development work on various
industrial projects and classroom teaching related to dynamic strength of
materials. Obtained Master's degree in July, 1971. Research work included
Stress wave propagation in and fracture of triangular plates, curved and
non-collinear bars and chains simulated by a series of rings. Took advanced
courses in Plasticity, Automatic control, Vector Mechanics, Impact Mechanics
etc.
4. MANUFACTURING:
Total 3 Years.
PAKISTAN MACHINE TOOLS
FACTORY, KARACHI:
1976-78
DEPUTY
MANAGER - Independent charge of Production Shop having about 100 heavy
production machines and sheet metal and welding shops, employing nearly 300
skilled workers, 4 engineers and 8 foremen. Activities included component
manufacturing and assembly of high precision machines and defense equipment.
Established record standards of productivity and machinery utilization and
maintenance.
5.. MISCELLANEOUS: Total 1 Year.
PAKISTAN IND. CREDIT
AND INVESTMENT CORP: 1968-69
MECHANICAL
ENGINEER - Worked on feasibility study, progress reporting and
credit-worthiness analysis for cold storage, electric fan plant, motorcycle factory
and textile mills etc.
PUBLICATIONS:
Papers:
1.
"Fracture Due to Stress Waves" - M.
Sc. Thesis
University of Manchester
UK,
1971.
2.
"Stress Wave Propagation and Fracture in thin Curved Bars" - Int. J.
Mech. Sc., June, 1971.
3.
"Fracture of Brittle Triangular Plates etc." J. Mech. Sc., I. Mech. E, UK,
July, 1972.
4.
"Fractures in Non-collinear Bars due to Stress Waves" - 9th National
Fracture Mechanics Conference, IEP, Karachi,
1993.
5.
"Noise Control in Airconditioning", NED University Seminar,
Karachi, 1994.
6.
“Commissioning of HVAC systems”, ASHRAE Pakistan Seminar, Karachi,
March, 2008.
7.
“How to Run an Engineering Business”, ASHRAE Seminar, Karachi, March,
2010.
8.
“Power Optimization in HVAC Design”, ASHRAE Seminar Karachi, June,
2011.
Books:
1.
Alternatives, e-book, Smashwords,
2012, https://www.smashwords.com/books/view/143460
2.
Islam Today, e-book, , Smashwords, 2012, https://www.smashwords.com/books/view/145605
3.
Angel’s Whisper, e-book, Smashwords, 2012, https://www.smashwords.com/books/view/155390
LANGUAGES SPOKEN AND WRITTEN:
English, Urdu, Persian, Bengali
and Arabic (not fluent)
SOCIAL ACTIVITIES & HOBBIES:
Held various positions in college and
university student unions, including Manchester Pakistan Society. Represented
EPUET in Gymnastics and Debating. Ex-GS PMTF Officer's Society. Active in
various institutional alumni associations. Edited numerous magazines. Interest
in poetry and Religion. Performed Haj thrice and Umra seven times.
Links: Face Book, Linkedin,